We have had the Vulcan S 250 installed inside the hospital now for a couple of months. We can identify a considerable benefit of the unit installed. We can barely see any scale deposits on the shower heads any more. This saves manpower and costs associated with exchanging sanitary equipment.
This installation was a government project and before the Vulcan descalers were installed it took a great deal of effort and expense to clean the heat exchangers. The Vulcan system has already proven its effectiveness since it has greatly prolonged the cleaning intervals. This government contract has reported they are very satisfied with the results of the Vulkcan descalers being able to effectively solve mineral scaling problems of the heat exchangers.
The Energy Complex in Thailand, the first office complex in Southeast Asia to receive LEED Platinum certification, installed Vulcan S250 and X-PRO 1 units on their condenser water system. Within 4 months, they eliminated 330 lbs of monthly scale buildup, reduced chiller approach temperatures, and improved overall energy performance.
Before installing the Vulcan unit, the scanning machine could not read barcodes due to scale incrustations. Now after installed Vulcan, the machine is able to read these bar codes correctly. Bigard is now saving on maintenance costs and reduced time spent on cleaning the washing machine and white boxes.
Before Vulcan S100 was installed in hotel’s main hot water line, the storage tanks had a solid 3 cm thick scale layer inside them and the pumping pressure from the booster set was at maximum while being unable to deliver adequate water pressure to the end of the line hotel rooms.
Page 3 of 4
The Vulcan mineral descaling hard water softening technology has been installed with success across the world: