The Criminal Risk: False Statements Are Not Just Fines

Most building owners focus on the $268/ton civil penalty. They miss the criminal liability hiding in the fine print.

DOB Is Now Collecting 2024 Penalties

$500k

Maximum criminal fine (LL97)

1 Year

Potential imprisonment

Per MT

Each misreported ton = separate violation

The law is clear: Under NYSDEC 6 NYCRR Part 253, "Each failure to measure or collect information that is required by the regulations is a separate violation." Each metric ton misreported is a separate violation.

LawCivil PenaltyCriminal PenaltyViolation Basis
LL97 $268/ton Up to $500,000 + imprisonment False statement
NYSDEC Part 253 $37,500/day Separate violation per MT Failure to measure/collect
⚠️ The "Guessing" Trap

If your monitoring plan claims "efficient operation" but your heat exchanger delta-T is 8°F instead of 20°F, that is fraudulent data collection. You cannot "estimate" your way out of a fouled heat exchanger.

🔍 What Actually Counts as a "False Statement"?

The Violation: Reporting emissions based on manufacturer's rated efficiency without verifying actual performance.

Example: Boiler rated at 85% efficiency, but scale has reduced it to 70%. You report based on 85%.

The Risk: Under-reporting emissions by 15% = criminal false statement.

The Violation: Failing to include "methods for quality assurance, maintenance, and repair of all measuring devices" in your monitoring plan.

Example: Your plan doesn't mention heat exchanger maintenance. The DOB asks: "How do you know your measurements are accurate?"

The Risk: Each missing method = separate violation.

The Violation: Submitting retrofit contracts signed after the deadline but dated earlier.

The Risk: Fraud = criminal liability. DOB auditors cross-reference permit filing dates.

📅 The December 31, 2026 Monitoring Plan Deadline

Any facility emitting >25,000 MT CO2e/year must submit a written greenhouse gas monitoring plan to NYSDEC by December 31, 2026.

This includes:

  • Large office buildings
  • Hospitals
  • Universities
  • Industrial facilities
  • Data centers

Your plan must include:

  • Personnel responsible for data collection
  • Methods for collecting required data
  • Methods for quality assurance, maintenance, and repair of all measuring devices

Your heat exchanger is a "measuring device." If you don't include maintenance methods, you violate.

Each missing element = separate violation.

If your plan fails to include:

  • Personnel: 1 violation
  • Collection methods: 1 violation
  • Quality assurance: 1 violation
  • Maintenance methods: 1 violation

Total: 4 violations × $37,500/day = $150,000/day potential exposure.

🏥 Real Proof: King Salman Hospital Protects Critical Systems

Facility: King Salman Hospital

The Challenge: Hospitals operate 24/7. Their reliance on water-cooled systems is absolute. From massive chillers regulating operating room temperatures to steam generators used in sterilization (autoclaves), mineral scale is a silent predator. Even a thin layer of scale can cause overheating in sensitive medical equipment, leading to catastrophic failure and expensive emergency repairs.

The Solution: Several Vulcan mineral descalers installed to treat the hospital water supply and keep equipment free of mineral scale buildup.

Systems Protected:

  • Boilers
  • Chillers
  • Pools
  • Domestic hot water systems

The Result: Accurate, defensible emissions data. No risk of false statements. Equipment operating at design efficiency.

King Salman Hospital Case Study

King Salman Hospital — Boilers, chillers, and pools protected

⚠️ Why Healthcare Faces Higher Criminal Risk

24/7 Operation

Hospitals never shut down. If equipment fails, there is no "maintenance window." Data must be reported accurately regardless.

Multiple Measuring Devices

Each boiler, chiller, heat exchanger, and sterilizer is a "measuring device." Each requires maintenance documentation.

High Temperature Systems

Sterilizers and autoclaves operate at high temperatures = rapid scale formation = rapid efficiency loss = data drift.

Public Scrutiny

Hospitals are high-profile. DOB and NYSDEC enforcement attracts media attention. Criminal charges would be front-page news.

✅ The Vulcan Solution: Defensible, Auditable, Accurate

Restore Design Efficiency

Vulcan's impulse technology breaks existing scale and prevents new formation. Delta-T returns to manufacturer specifications. Your measurements reflect actual emissions.

Document Your Good Faith

Installation date. Pre-installation delta-T. Post-installation improvement. This is your Exhibit A when regulators ask: "What did you do to maintain measuring devices?"

No Chemicals, No Maintenance

Unlike chemical treatment that requires ongoing verification and reporting, Vulcan is passive. Install it once. It works forever. Your monitoring plan just got simpler.

Protect Against Criminal Liability

False statements = up to $500,000 and potential imprisonment. Accurate measurements require accurate equipment. Vulcan ensures your data is defensible.

📊 The Cost of "Guessing" vs. The Cost of Knowing

Vulcan Descaling (One-time cost) $15,000
3%
LL97 Civil Penalty (200 MT excess) $53,600
11%
Criminal Fine (False Statement) $500,000
100%

Vulcan is the only efficiency measure that pays for itself AND protects you from criminal liability.

About Vulcan Mineral Descaling Technology

All Vulcan units are secured via our specialized anchor mounting system, providing a permanent, vibration-resistant fit for industrial pipes. As a mineral descaler, Vulcan uses custom-tailored impulse bands to treat water flow electronically, preventing calcium and magnesium from forming hard deposits while leaving the water's chemical composition unchanged.

  • Pipe diameters from ½ inch to 40 inch
  • Works on every pipe material: iron, inox, copper, stainless steel, galvanized iron, plastic, PVC, PE-x, hose, compound pipes
  • Fully cast in acrylic for optimal quality endurance
  • Do-it-Yourself installation without cutting pipes
  • Zero salt, zero chemicals, zero maintenance

When to Prioritize Vulcan for Legal Protection
  • Immediate Priority: Any facility >25,000 MT CO2e submitting a monitoring plan by December 31, 2026. Include Vulcan as your "quality assurance method for heat transfer surfaces."
  • High Priority: Hospitals, data centers, universities where equipment failure = operational shutdown AND criminal risk.
  • Mission Critical: Facilities with multiple heat exchangers, boilers, or cooling towers that require maintenance documentation.
  • LL97 + NYSDEC Overlap: Facilities covered by both laws. One Vulcan unit serves both compliance obligations.
  • Any Facility With: Heat exchangers, boilers, cooling towers, or recirculating hot water systems. If it transfers heat to water, it scales. If it scales, your data drifts.

Don't Let "Guessing" Become Criminal Liability

The monitoring plan deadline is December 31, 2026. Every day of scale is a day of inaccurate data.

About the Author

Waslix- Clearly Clean Water (Vulcan Mineral Descaler) provides non-chemical, maintenance-free scale prevention solutions for commercial, industrial, and residential buildings. Vulcan is trusted by hospitals, hotels, restaurants, and industrial facilities worldwide.